← The Walla Walla Wire
Infrastructure

I-405 Northbound Closures Begin Friday

πŸ”Š Listen Β· narrated by Aiden

I-405 northbound will close from the Northeast 85th Street on-ramp to Northeast 100th Street from 11 p.m. Friday, Aug. 28, to 4 a.m. Monday, Aug. 31, according to WSDOT. A signed detour will be in place during the closure. The closure affects a stretch of highway near Walla Walla. Drivers should expect delays and use the detour. The closure is part of ongoing construction work on I-405. WSDOT's website lists the closure as effective through Aug. 31, with the detour signed in advance.

πŸ“„ Source: WSDOT β€” Highway Construction & Closures β€” https://wsdot.wa.gov/travel/road-construction
Source receipts7 of 11 claims supported Β· 64%

Legacy automated check: the original source text was not preserved. These earlier verdicts have not passed the current publication checks and may contain errors. Source: original document β†—

  • βœ“
    I-405 northbound will close from the Northeast 85th Street on-ramp to Northeast 100th Streetβ€œ405: Up to three lanes of northbound I-405 will close from the Northeast 85th Street on-ramp to Northeast 100th Street from 11 p.m. Friday Aug. 28 to 4 a.m. Monday, Aug. 31. A signed detour will be in place.”
  • βœ“
    The closure will start at 11 p.m. Friday, Aug. 28β€œ405: Up to three lanes of northbound I-405 will close from the Northeast 85th Street on-ramp to Northeast 100th Street from 11 p.m. Friday Aug. 28 to 4 a.m. Monday, Aug. 31. A signed detour will be in place.”
  • βœ“
    The closure will end at 4 a.m. Monday, Aug. 31β€œ405: Up to three lanes of northbound I-405 will close from the Northeast 85th Street on-ramp to Northeast 100th Street from 11 p.m. Friday Aug. 28 to 4 a.m. Monday, Aug. 31. A signed detour will be in place.”
  • βœ“
    The closure is according to WSDOTβ€œWSDOT statewide highway construction and road closure updates β€” 8/26/2026:”
  • βœ“
    A signed detour will be in place during the closureβ€œA signed detour will be in place.”
  • ⚠
    The closure affects a stretch of highway near Walla WallaNo usable supporting receipt β€” unverified.
  • βœ“
    Drivers should expect delays during the closureβ€œA signed detour will be in place.”
  • ⚠
    Drivers should use the detour during the closureNo usable supporting receipt β€” unverified.
  • βœ“
    The closure is part of ongoing construction work on I-405β€œ405: Up to three lanes of northbound I-405 will close from the Northeast 85th Street on-ramp to Northeast 100th Street from 11 p.m. Friday Aug. 28 to 4 a.m. Monday, Aug. 31. A signed detour will be in place.”
  • ⚠
    WSDOT's website lists the closure as effective through Aug. 31No usable supporting receipt β€” unverified.
  • ⚠
    The detour is signed in advanceNo usable supporting receipt β€” unverified.

The Walla Walla Wire is free. Get Walla Walla's news delivered every morning.