← The Walla Walla Wire
Infrastructure

I-405, SR 532 closures begin this week

πŸ”Š Listen Β· narrated by Aiden

Starting Monday, July 27, up to two lanes of southbound I-405 between mileposts 18.11 and 16.45 will close nightly from 11 p.m. to 4 a.m. until Friday, July 31.

State Route 532 will see westbound traffic shifted between mileposts 4 and 3 from 9 p.m. Sunday, August 2, to 4 a.m. Monday, August 3, for paving work. Other closures include SR 203, SR 96, SR 522, SR 211, and US 2, all with specific dates, times, and locations detailed in WSDOT's updates.

πŸ“„ Source: WSDOT β€” Highway Construction & Closures β€” https://wsdot.wa.gov/travel/road-construction
Source receipts7 of 13 claims supported Β· 54%

Legacy automated check: the original source text was not preserved. These earlier verdicts have not passed the current publication checks and may contain errors. Source: original document β†—

  • βœ“
    Starting Monday, July 27, up to two lanes of southbound I-405 between mileposts 18.11 and 16.45 will close nightlyβ€œ405: Monday, July 27 to the morning of Friday, July 31: Up to two lanes of southbound I-405 between milepost 18.11 and milepost 16.45 will be closed, nightly from 11 p.m. – 4 a.m.”
  • βœ“
    The closure of southbound I-405 will be from 11 p.m. to 4 a.m.β€œ405: Monday, July 27 to the morning of Friday, July 31: Up to two lanes of southbound I-405 between milepost 18.11 and milepost 16.45 will be closed, nightly from 11 p.m. – 4 a.m.”
  • βœ“
    The closure of southbound I-405 will continue until Friday, July 31β€œ405: Monday, July 27 to the morning of Friday, July 31: Up to two lanes of southbound I-405 between milepost 18.11 and milepost 16.45 will be closed, nightly from 11 p.m. – 4 a.m.”
  • βœ“
    State Route 532 will see westbound traffic shifted between mileposts 4 and 3β€œ532: From 9 p.m. Sunday, Aug. 2 to 4 a.m. Monday, Aug. 3, the westbound traffic on SR 532/Camano Island Highway between 102nd Avenue Northwest (milepost 4) and 104th Drive Northwest (milepost 3) will see a traffic shift for maintenance paving.”
  • βœ“
    The traffic shift on State Route 532 will occur from 9 p.m. Sunday, August 2β€œ532: From 9 p.m. Sunday, Aug. 2 to 4 a.m. Monday, Aug. 3, the westbound traffic on SR 532/Camano Island Highway between 102nd Avenue Northwest (milepost 4) and 104th Drive Northwest (milepost 3) will see a traffic shift for maintenance paving.”
  • βœ“
    The traffic shift on State Route 532 will end at 4 a.m. Monday, August 3β€œ532: From 9 p.m. Sunday, Aug. 2 to 4 a.m. Monday, Aug. 3, the westbound traffic on SR 532/Camano Island Highway between 102nd Avenue Northwest (milepost 4) and 104th Drive Northwest (milepost 3) will see a traffic shift for maintenance paving. Effective: Jul 30, 2026, 9:07 AM Expected end: Aug 3, 2026, 4:00 AM”
  • βœ“
    The traffic shift on State Route 532 is for paving workβ€œ532: From 9 p.m. Sunday, Aug. 2 to 4 a.m. Monday, Aug. 3, the westbound traffic on SR 532/Camano Island Highway between 102nd Avenue Northwest (milepost 4) and 104th Drive Northwest (milepost 3) will see a traffic shift for maintenance paving.”
  • ⚠
    Other closures include SR 203No usable supporting receipt β€” unverified.
  • ⚠
    Other closures include SR 96No usable supporting receipt β€” unverified.
  • ⚠
    Other closures include SR 522No usable supporting receipt β€” unverified.
  • ⚠
    Other closures include SR 211No usable supporting receipt β€” unverified.
  • ⚠
    Other closures include US 2No usable supporting receipt β€” unverified.
  • ⚠
    All other closures have specific dates, times, and locations detailed in WSDOT's updatesNo usable supporting receipt β€” unverified.

The Walla Walla Wire is free. Get Walla Walla's news delivered every morning.