← The Walla Walla Wire
Infrastructure

SR 21 closure from Sept. 14–25

🔊 Listen · narrated by Aiden

State Route 21 will be closed for road work between milepost 4 and milepost 7, about four miles north of Kahlotus and State Route 260, from 10:18 a.m. Sept. 14 through 5 p.m. Sept. 25, 2026.

Drivers should expect delays and follow signed detours during the closure period. The work is scheduled to end on Sept. 25, 2026, with no further details provided by WSDOT on the nature of the repairs.

📄 Source: WSDOT — Highway Construction & Closures — https://wsdot.wa.gov/travel/road-construction
Source receipts4 of 4 passages supported · 100%

Automated checks compare the headline, summary and each body passage with the saved source. A checkmark records the model’s assessment; readers can inspect the quote. Source: original document ↗

  • ✓
    SR 21 closure from Sept. 14–25“021 [44 mi from Walla Walla]: Closure for road work, on SR 21 both directions between MP 4 and MP 7, about four miles North of Kahlotus and SR 260, beginning at 10:18 am on September 14, 2026 until about September 25, 2026. Follow signed detour in place. Expect delays.”
  • ✓
    State Route 21 closed for road work between MP 4 and MP 7, north of Kahlotus, with detours in place.“021 [44 mi from Walla Walla]: Closure for road work, on SR 21 both directions between MP 4 and MP 7, about four miles North of Kahlotus and SR 260, beginning at 10:18 am on September 14, 2026 until about September 25, 2026. Follow signed detour in place. Expect delays.”
  • ✓
    State Route 21 will be closed for road work between milepost 4 and milepost 7, about four miles north of Kahlotus and State Route 260, from 10:18 a.m. Sept. 14 through 5 p.m. Sept. 25, 2026.“021 [44 mi from Walla Walla]: Closure for road work, on SR 21 both directions between MP 4 and MP 7, about four miles North of Kahlotus and SR 260, beginning at 10:18 am on September 14, 2026 until about September 25, 2026. Follow signed detour in place. Expect delays. Effective: Sep 14, 2026, 10:18 AM Expected end: Sep 25, 2026, 5:00 PM”
  • ✓
    Drivers should expect delays and follow signed detours during the closure period. The work is scheduled to end on Sept. 25, 2026, with no further details provided by WSDOT on the nature of the repairs.“Closure for road work, on SR 21 both directions between MP 4 and MP 7, about four miles North of Kahlotus and SR 260, beginning at 10:18 am on September 14, 2026 until about September 25, 2026. Follow signed detour in place. Expect delays.”
Source text saved for this check (2026-09-19T07:10:28.573Z)
WSDOT highway construction and road closures within 50 miles of Walla Walla — 9/19/2026:

021 [44 mi from Walla Walla]: Closure for road work, on SR 21 both directions between MP 4 and MP 7, about four miles North of Kahlotus and SR 260,  beginning at 10:18 am on September 14, 2026 until about September 25, 2026.  Follow signed detour in place. Expect delays.
Effective: Sep 14, 2026, 10:18 AM
Expected end: Sep 25, 2026, 5:00 PM

The Walla Walla Wire is free. Get Walla Walla's news delivered every morning.