WSDOT will control traffic for cable installation on both directions of a stretch of road in Pomeroy, 45 miles from Walla Walla. The closure will occur Monday through Friday from 8 a.m. to 4 p.m. daily. The cable work will be ongoing until Oct 1, 2026, at 4:00 PM, with the effective date starting on Sep 20, 2026, at 11:38 PM.
Cable work to close Pomeroy roads
π Listen Β· narrated by Aiden
π Source: WSDOT β Highway Construction & Closures β https://wsdot.wa.gov/travel/road-construction
Source receipts3 of 3 passages supported Β· 100%
Automated checks compare the headline, summary and each body passage with the saved source. A checkmark records the modelβs assessment; readers can inspect the quote. Source: original document β
- βCable work to close Pomeroy roadsβBoth directions between 6th street and south 7th street in Pomeroy. Until further notice, Monday through Friday from 8 a.m. to 4 p.m. daily, there will be alternating-flagged controlled traffic for cable installation.β
- βWSDOT to control traffic for cable installation on Pomeroy streets, Sept 20- Oct 1.β012 [45 mi from Walla Walla]: Both directions between 6th street and south 7th street in Pomeroy. Until further notice, Monday through Friday from 8 a.m. to 4 p.m. daily, there will be alternating-flagged controlled traffic for cable installation. Effective: Sep 20, 2026, 11:38 PM Expected end: Oct 1, 2026, 4:00 PMβ
- βWSDOT will control traffic for cable installation on both directions of a stretch of road in Pomeroy, 45 miles from Walla Walla. The closure will occur Monday through Friday from 8 a.m. to 4 p.m. daily. The cable work will be ongoing until Oct 1, 2026, at 4:00 PM, with the effective date starting on Sep 20, 2026, at 11:38 PM.β012 [45 mi from Walla Walla]: Both directions between 6th street and south 7th street in Pomeroy. Until further notice, Monday through Friday from 8 a.m. to 4 p.m. daily, there will be alternating-flagged controlled traffic for cable installation. Effective: Sep 20, 2026, 11:38 PM Expected end: Oct 1, 2026, 4:00 PMβ
Source text saved for this check (2026-09-25T12:57:22.101Z)
WSDOT highway construction and road closures within 50 miles of Walla Walla β 9/25/2026: 012 [45 mi from Walla Walla]: Both directions between 6th street and south 7th street in Pomeroy. Until further notice, Monday through Friday from 8 a.m. to 4 p.m. daily, there will be alternating-flagged controlled traffic for cable installation. Effective: Sep 20, 2026, 11:38 PM Expected end: Oct 1, 2026, 4:00 PM
The Walla Walla Wire is free. Get Walla Walla's news delivered every morning.