← The Walla Walla Wire
Infrastructure

WSDOT bridge work closes one lane on Umatilla Bridge

πŸ”Š Listen Β· narrated by Aiden

Eastbound milepost 132 over the Umatilla Bridge will have a single lane closure with speed reductions and width restrictions until further notice. The 10-ft width restriction applies from 7 a.m. to 6 p.m., and the 14-ft width restriction applies from 6 p.m. to 7 a.m.

πŸ“„ Source: WSDOT β€” Highway Construction & Closures β€” https://wsdot.wa.gov/travel/road-construction
Source receipts3 of 3 passages supported Β· 100%

Automated checks compare the headline, summary and each body passage with the saved source. A checkmark records the model’s assessment; readers can inspect the quote. Source: original document β†—

  • βœ“
    WSDOT bridge work closes one lane on Umatilla Bridgeβ€œ082 [48 mi from Walla Walla]: Eastbound milepost 132 over the Umatilla Bridge, until further notice, there will be a single lane closure with speed reductions and width restrictions. There is a 10-ft width restriction from 7 a.m. until 6 p.m., and a 14-ft width restriction from 6 p.m. until 7 a.m.”
  • βœ“
    Single-lane closure with width restrictions on Umatilla Bridge over Umatilla River, effective until Nov. 6, 2026.β€œ082 [48 mi from Walla Walla]: Eastbound milepost 132 over the Umatilla Bridge, until further notice, there will be a single lane closure with speed reductions and width restrictions. There is a 10-ft width restriction from 7 a.m. until 6 p.m., and a 14-ft width restriction from 6 p.m. until 7 a.m.”
  • βœ“
    Eastbound milepost 132 over the Umatilla Bridge will have a single lane closure with speed reductions and width restrictions until further notice. The 10-ft width restriction applies from 7 a.m. to 6 p.m., and the 14-ft width restriction applies from 6 p.m. to 7 a.m.β€œEastbound milepost 132 over the Umatilla Bridge, until further notice, there will be a single lane closure with speed reductions and width restrictions.”
Source text saved for this check (2026-11-03T08:35:13.349Z)
WSDOT highway construction and road closures within 50 miles of Walla Walla β€” 11/3/2026:

012 [35 mi from Walla Walla]: Southbound milepost 294 Pasco. Through Thursday, Nov. 5 at 3 p.m. there will be a single right-lane closure for bridge work.
Effective: Sep 6, 2026, 10:18 PM
Expected end: Nov 5, 2026, 3:00 PM

082 [48 mi from Walla Walla]: Eastbound milepost 132 over the Umatilla Bridge, until further notice, there will be a single lane closure with speed reductions and width restrictions. There is a 10-ft width restriction from 7 a.m. until 6 p.m., and a 14-ft width restriction from 6 p.m. until 7 a.m.
Effective: Apr 26, 2025, 9:09 PM
Expected end: Nov 6, 2026, 11:55 PM

The Walla Walla Wire is free. Get Walla Walla's news delivered every morning.